پروژه ها

Strengthening of railway bridges on the Bafgh-Bandar Abbas axial railroad (second segment) (Ghare tappe-Enshe’ab, Enshe’ab-Bandar Abbas, Enshe’ab-Shahid Rajaei) in order to increase load bearing capacity using non-industrial EPC method

Strengthening of railway bridges on the Bafgh-Bandar Abbas axial railroad (second segment) (Ghare tappe-Enshe’ab, Enshe’ab-Bandar Abbas, Enshe’ab-Shahid Rajaei) in order to increase load bearing capacity using non-industrial EPC method

اطلاعات تکمیلی پروژه

نقش ها

پروژه های مرتبط

Edit Content
Edit Content
Additional project information

Strengthening of railway bridges on the Bafgh-Bandar Abbas axial railroad (second segment) (Ghare tappe-Enshe’ab, Enshe’ab-Bandar Abbas, Enshe’ab-Shahid Rajaei) in order to increase load bearing capacity using non-industrial EPC method