Skip to content
Home page
Projects
News
Tenders and auctions
Job opportunities
About us
Ariana at a glance
تاریخچه
حاکمیت
مدیریت
Certificates and awards
مسئولیت اجتماعی
نوآوری
Contact us
X
Fa
Fa
Ru
En
Ar
Completed projects
Home page
»
وضعیت های پروژه
»
Completed projects
Project type
Internal
External
Project status
Ongoing projects
Completed projects
Filters
Remove filters
Search
وضعیت پروژه ها
Ongoing projects
(14)
Completed projects
(33)
نوع پروژه ها
Internal
(21)
External
(26)
دسته پروژه ها
Dam Construction
(3)
Flood Protection System
(1)
Roads, Bridges and Highways
(15)
Geotechnical Engineering
(2)
Water Transmission
(3)
Irrigation
(11)
Pollution Control
(1)
Tunnel
(2)
Hydropower Plants
(1)
Mining Infrastructure
(1)
Metro and Railway
(1)
Buildings
(8)
Pavement Repair
(0)
نمایش فیلترها
پاک کردن فیلترها
فیلترکن
Project for the construction of the Right Bank Canal and the Topolang-Karatagsky Irrigation Canal in the Republic of Uzbekistan
Project for the reconstruction of the Elikala-1 canals in the Republic of Uzbekistan
Construction of Shagun-Zighar Road in the Republic of Tajikistan (Phase 2) & (Phase 3)
Construction works of the Dushanbe–Qurghonteppa railway line, Vahdat–Yovon section in the Republic of Tajikistan
Construction and development of the intake structure of the dam and the Rogun Hydropower Plant
Geotechnical operations at the Sangtuda-1 Hydropower Plant in the Republic of Tajikistan
Construction of Ayni-Mast Chah Koohi road
Construction of new landfill HRAZDAN (including buildings and structures)
Rehabilitation of Main and Secondary Canals under the Irrigation System Mdoernization -Phase 1, 2 & 3
Design and construction of Bagratashen Bridge on the border crossing between Armenia and Georgia
Construction of foundation and retaining wall of ozgol project (Tehran)
Reconstruction and completion of collapsible roofs of the exhibition halls
No items found.
1
2
3